Boden Business Park Area

The Boden Business Park Area offers greenfields with good opportunities to establish a data center quickly. Being a part of the Business Park Area gives the advantage to work in a developing environment surrounded by other companies thriving for technical and digital development.  

Location
Lat 65.75779, Long 21.76010

Distances
23 km, 20 minutes by car to Facebook data center
34 km, 30 minutes by car to Airport
24 km, 20 minutes by car to Luleå University of Technology Main campus

Power
Current load to the site is 12 MW (20 kV line). Possibility to expand to 40MW within 6 months.

Site access
Existing road access.

Connectivity
Redundant dark fiber at site border.

Cooling
Fresh air cooling 12 months per year.

Water and wastewater
Water and wastewater connection at site boundary.

 

Prepared land areas for Data center sites

Owner
Boden Municipality

Total buildable size
Total area is up to 6 hectares. Unlimited building area ratio.

Site characteristics
Greenfield

 

Benefits

Establishing a data center at the Business Park Area has several benefits. Numerous feeders of the regional grids passes close to the area and the national grid substation is located near by. They supplies the site with redudant and sustainable power which is free from interruption. The areas power sub station has a capacity of 40MW. Through two connection points not far from the site it’s supplied with Europes leading Tier l fiber supplier – TeliaSonera. They offer redundant fiber to the most reliable supply. Through Luleå Rivers large amount of natural cooling and renewable hydropower the site also has a well developed water- and sewer system.

Time to market

Time factor     Effect    
Power supply     Redundance      
         
Current 12MW 400V/20 kV 2 conn.  
6 months 40MW 20kV 2 conn.